Installation Guide

Odyssey Circular Elevators are engineered for compact spaces, architectural elegance, and smooth vertical mobility. Our installation process is streamlined to suit circular elevator structures while ensuring the highest safety and performance standards.

Pre-Installation Assessment

Site Evaluation

Verification of circular shaft diameter, floor configuration (up to G+3), minimum headroom of 2800 mm, and maximum travel height up to 14 metres.

Power Requirement Planning

Single Phase or 3 Phase power confirmation based on the selected circular model (ORBIT, APEX, or NOVA).

Design & Customization Finalization

Cabin diameter, door configuration (manual swing or automatic sliding), glass/finish options, flooring, and colour selections are finalized before production.

Installation Process

1/6

Structural Readiness Approval

Confirmation of civil shaft completion and electrical provisions.

2/6

Circular Guide Rail Installation

Installation of greaseless circular guide rails for silent and vibration-free travel.

3/6

Drive & Control Cabin & Door Installation Setup

Integration of advanced drive units with modular all-in-one controllers.

4/6

Cabin & Door
Installation

Precision mounting of circular cabin, doors, smart beam sensors, and control panels.

5/6

Electrical & Safety Integration

Installation of UPS rescue system, overspeed governor, limit switches, and safety circuits.

6/6

Testing, Calibration & Handover

Load testing, speed calibration, safety validation, and user demonstration.